STANDARD GUIDE

Enterprise AI Platform Selection: A 30-Day Governance and Evaluation Workbook

This practical workbook translates the November 2024 enterprise AI platform discussion into a four-week selection process. It prioritises business outcomes, data handling and repeatable evaluation over a sequence of vendor demonstrations

INSIGHTS / Guide overview

Guide overview

Five-step practical exercise: Choose one process with a named executive sponsor and visible baseline metrics. Record the people involved, information they use and final decisions requiring human judgement. For a customer-service summarisation case, measure the time to read a ticket, draft a response and verify its correctness. Separate cost savings from quality improvements; a plausible faster response is not necessarily a more accurate one. Set boundaries around customer data before vendors receive sample material.

Technology executives, architects, procurement teams and privacy leads

INSIGHTS / What you will learn

What you will learn

  1. Define the business workflow (days 1–5)
  2. Map data, identities and contractual requirements (days 6–10)
  3. Run comparable model and platform tests (days 11–18)
  4. Validate operating controls (days 19–24)
  5. Decide, pilot and establish review gates (days 25–30)
INSIGHTS / The guide

The guide

Chapter 1 — Define the business workflow (days 1–5)

Choose one process with a named executive sponsor and visible baseline metrics. Record the people involved, information they use and final decisions requiring human judgement. For a customer-service summarisation case, measure the time to read a ticket, draft a response and verify its correctness. Separate cost savings from quality improvements; a plausible faster response is not necessarily a more accurate one. Set boundaries around customer data before vendors receive sample material.

Define acceptance for this stage before a supplier or implementation team shows its preferred outcome. A passing example produces contract clause, control evidence date, test export and exception approval, demonstrates the correct access or approval boundary and allows a second reviewer to reproduce the observation. A failing example leaves the cause of contract lock-in and unclear data processing commitments unresolved or relies on an undocumented administrator privilege. Record “pass”, “conditional” or “fail” with a reason and a retest owner; a conditional pass must have an expiry date. For ai & automation, also record the operational indicator unresolved material supplier exceptions at renewal, because a technically correct configuration may still create unacceptable user effort. For the chapter 1 — define the business workflow (days 1–5) step, retain a before-and-after sample and ask a second reviewer to compare the actual record with the expected approval state. the responsible team should be able to explain any mismatch without access to the developer who configured the workflow. Where the evidence is ambiguous, mark the case unresolved and request a bounded retest; a completed checklist is not the same as a verified outcome.

Putting the current workflow into practice

An ordinary success case does not establish that one authoritative record for each field and a traceable approval for changes. Run an access request from an identity outside the permitted role. The business action should be denied at the destination and the reason visible in the audit record. A control that cannot be repeated under ordinary user permissions remains unproven. Record the failed condition and the person authorised to accept any temporary workaround. Where the result is unsafe, pause the connector and correct the authoritative record before replaying queued events. The risk owner should see the denial or correction evidence before approving further access. Before leaving the chapter 1 — define the business workflow (days 1–5) stage, confirm who can repeat the test and how the next team will obtain the evidence.

An interface decision becomes clearer when a sales order synchronising from CRM into the finance system after a price change. Name the source of truth for each field and give updates a unique transaction reference. The approval and version must survive retries, otherwise a delayed message may overwrite the corrected state. Use a synthetic update followed by an out-of-order duplicate. The test passes only if the approved later value remains authoritative and any correction is attributable to an owner. The change belongs to business applications lead; when reconciliation cannot be demonstrated, the safe alternative is a controlled manual reconciliation until the interface contract is proven. Before leaving the chapter 1 — define the business workflow (days 1–5) stage, confirm who can repeat the test and how the next team will obtain the evidence.

Chapter 2 — Map data, identities and contractual requirements (days 6–10)

Draw the complete path from user input through model endpoint, retrieval system, logs, storage and human review. Record data residency assumptions and which entities can access prompts and outputs. Document service accounts and relevant privacy restrictions. The resulting data-flow register should be a reviewable artefact, not a collection of email assurances. If the architecture cannot be explained simply, the pilot is not ready for approval.

Technology Plus can assist with AI Consulting & Strategy when this work moves from planning into implementation.

Related reading: AWS Introduced Amazon Nova Foundation Models on 3 December 2024 · Connecting reasoning-model evaluation and oversight to CRM, ERP and Power Platform workflows

Define acceptance for this stage before a supplier or implementation team shows its preferred outcome. A passing example produces contract clause, control evidence date, test export and exception approval, demonstrates the correct access or approval boundary and allows a second reviewer to reproduce the observation. A failing example leaves the cause of contract lock-in and unclear data processing commitments unresolved or relies on an undocumented administrator privilege. Record “pass”, “conditional” or “fail” with a reason and a retest owner; a conditional pass must have an expiry date. For ai & automation, also record the operational indicator unresolved material supplier exceptions at renewal, because a technically correct configuration may still create unacceptable user effort. For the chapter 2 — map data, identities and contractual requirements (days 6–10) step, start by identifying who may change the live record, which evidence must exist beforehand and when a request should be refused. Have Professional Services staff test the rule with an example, then file the authorisation result and observed downstream state together. The output is a reviewable approval boundary, not a broad assurance that the tool is safe.

Putting target outcomes and dependencies into practice

Assess vendor claims using the same controlled business case for every option. Ask how data can be returned, support identities revoked and outstanding work recovered if the contract ends. A written statement of data ownership should be supported by an observed export. Retain the supplier response, supporting evidence, risk acceptance and retest date. The procurement decision remains reviewable when named staff or product versions change. For this service, document one authoritative record for each field and a traceable approval for changes and require a named owner for every unmet mandatory condition. The outcome for the chapter 2 — map data, identities and contractual requirements (days 6–10) stage is a dated record of the accepted business state and any remaining exception.

Assess vendor claims using the same controlled business case for every option. Retain the supplier response, supporting evidence, risk acceptance and retest date. The procurement decision remains reviewable when named staff or product versions change. Ask how data can be returned, support identities revoked and outstanding work recovered if the contract ends. A written statement of data ownership should be supported by an observed export. For this service, document one authoritative record for each field and a traceable approval for changes and require a named owner for every unmet mandatory condition. Before leaving the chapter 2 — map data, identities and contractual requirements (days 6–10) stage, confirm who can repeat the test and how the next team will obtain the evidence.

Chapter 3 — Run comparable model and platform tests (days 11–18)

Use the same set of de-identified tasks across candidate platforms. Include routine cases, ambiguous cases, incorrect source documents and a deliberately adversarial instruction embedded in retrieved content. Score factual correctness, citation quality, cost, latency, accessibility and refusal behaviour. Separate a model's raw capability from the application's retrieval and permission design. Store the tested prompt and model configuration so an improvement claim can be reproduced.

Define acceptance for this stage before a supplier or implementation team shows its preferred outcome. A passing example produces contract clause, control evidence date, test export and exception approval, demonstrates the correct access or approval boundary and allows a second reviewer to reproduce the observation. A failing example leaves the cause of contract lock-in and unclear data processing commitments unresolved or relies on an undocumented administrator privilege. Record “pass”, “conditional” or “fail” with a reason and a retest owner; a conditional pass must have an expiry date. For ai & automation, also record the operational indicator unresolved material supplier exceptions at renewal, because a technically correct configuration may still create unacceptable user effort. For the chapter 3 — run comparable model and platform tests (days 11–18) step, record the cost of corrections and retesting rather than reporting only a nominal time saving. Keep the number of human corrections, exception tickets and unresolved decisions visible to Professional Services management. If the workflow improves throughput but increases audit effort or recovery risk, narrow its use until the additional controls have an owner and a repeatable test.

Putting permissions and integration design into practice

Any sensitive workflow needs a reliable denial path as well as a permitted one. Look for unexpected data movement between groups or tenants rather than assuming a correct sign-in means the record is safe. Check the final record state after a deliberate negative case. Separate staff, supplier and automated identities. Each should have the minimum scope necessary to complete the approved task, and privileged access needs a specific expiry and owner. Where the result is unsafe, pause the connector and correct the authoritative record before replaying queued events. The risk owner should see the denial or correction evidence before approving further access. Before leaving the chapter 3 — run comparable model and platform tests (days 11–18) stage, confirm who can repeat the test and how the next team will obtain the evidence.

Acceptance criteria should be agreed before the preferred configuration is demonstrated. Keep CRM record ID, ERP posting, event timestamp and exception owner with the result. Record what the operator expected, what actually happened, who reviewed the difference and which correction followed. Test a normal request and then deliver a delayed order update after invoicing and verify that the owner must approve any correction. Classify the result as accepted, safely refused, incomplete or incorrectly accepted, rather than reporting a single success percentage. The record should be understandable to sales operations, the finance controller and the integration owner, who can agree a pass, a revision or a pause based on observed outcomes. Before leaving the chapter 3 — run comparable model and platform tests (days 11–18) stage, confirm who can repeat the test and how the next team will obtain the evidence.

Chapter 4 — Validate operating controls (days 19–24)

Ask each provider or internal platform team to demonstrate audit logs, access separation, model change processes, quotas, incident response and credential revocation. Verify how an application behaves if the model endpoint is unavailable. Run an explicit cost-limit exercise and confirm who receives alerts. For any tool that writes to business systems, test authorisation and rollback. A feature on a roadmap is not equivalent to a control running in your tenant.

Putting cutover and fallback into practice

Any sensitive workflow needs a reliable denial path as well as a permitted one. A control that cannot be repeated under ordinary user permissions remains unproven. Record the failed condition and the person authorised to accept any temporary workaround. Look for unexpected data movement between groups or tenants rather than assuming a correct sign-in means the record is safe. Check the final record state after a deliberate negative case. Where the result is unsafe, pause the connector and correct the authoritative record before replaying queued events. The risk owner should see the denial or correction evidence before approving further access. Before leaving the chapter 4 — validate operating controls (days 19–24) stage, confirm who can repeat the test and how the next team will obtain the evidence.

Recovery is meaningful only when the business process that depends on CRM, ERP and the integration platform can finish. After restoring the platform, ask a business owner to complete the original task and verify dependent records. Retain the outstanding exception list until it has been reconciled. Time the interruption from the first affected user transaction to a verified corrected result. Include identity services, data dependencies and the work required to reconcile actions taken during the outage. If the test fails, pause the connector and correct the authoritative record before replaying queued events. Reopen the service only after the affected business owner confirms a valid final state. The outcome for the chapter 4 — validate operating controls (days 19–24) stage is a dated record of the accepted business state and any remaining exception.

Chapter 5 — Decide, pilot and establish review gates (days 25–30)

Produce a two-page decision record comparing the baseline, selected workflow, evaluated options, unresolved risks and expected operating cost. Approve a time-limited pilot with a maximum data classification, spending cap, owner and review date. Do not scale solely because employees like the interface. Require measured benefit and no unresolved high-severity issues before extending the pilot to new teams or sensitive data.

Putting the operating handover into practice

A credible cost estimate begins with the frequency and handling cost of a sales order synchronising from CRM into the finance system after a price change. Compare the current process with a limited improvement and a larger deployment. Include integration support, access reviews, correction work and the cost of reverting to the prior operating process. Use accepted completed tasks as the denominator for benefit calculations. If manual reviews rise after automation, record the extra labour instead of presenting gross time saved as a cash benefit. Report reconciliation differences, duplicated updates and time to resolve failed writes along with support effort, and set a review date when the funding decision may be changed. Before leaving the chapter 5 — decide, pilot and establish review gates (days 25–30) stage, confirm who can repeat the test and how the next team will obtain the evidence.

A practical operating decision begins with a sales order synchronising from CRM into the finance system after a price change. Review repeated service failures for a common dependency or unclear ownership. Changes should produce a better diagnostic or decision path, not just another generic checklist. Record user-confirmed task completion alongside system health. A service that appears restored but leaves the underlying record incorrect is not ready for closure. Where the outcome affects authorised data use, correct approvals and a reliable business outcome, the process owner and business reviewer should confirm that the user’s task can safely resume. Before leaving the chapter 5 — decide, pilot and establish review gates (days 25–30) stage, confirm who can repeat the test and how the next team will obtain the evidence.

Illustrative business scenario

For a manufacturing operations team, the candidate AI use case is to classify maintenance requests by plant and urgency. Four vendors give impressive demonstrations with unrelated examples. The evaluation team instead prepares 40 sanitised historical requests, including duplicate descriptions and ambiguous fault codes, then records correct routing and correction time. A platform that wins a generic benchmark may lose this workflow because it does not recognise the organisation’s terminology.

Decision record and evidence

The investment committee should see the original baseline, evaluation dataset, data-flow approvals, test results, support commitment and a named owner for each unresolved risk. Use the same decision template after the pilot to compare assumptions with observed results.

Practical action checklist

  • Appoint an accountable process sponsor and named data owner
  • Measure current turnaround time, quality and human correction effort
  • Produce a reviewed prompt-to-output and system-to-system data-flow map
  • Create at least 30 de-identified and adversarial evaluation cases
  • Test the same cases, budgets and latency assumptions across candidates
  • Capture logs, access controls, incident response and rollback evidence
  • Approve a limited pilot with an explicit review date
  • Publish a signed decision record including rejected alternatives

Sources and further reading

INSIGHTS / Practical checklist

Practical checklist

  • Appoint an accountable process sponsor and named data owner
  • Measure current turnaround time, quality and human correction effort
  • Produce a reviewed prompt-to-output and system-to-system data-flow map
  • Create at least 30 de-identified and adversarial evaluation cases
  • Test the same cases, budgets and latency assumptions across candidates
  • Capture logs, access controls, incident response and rollback evidence
  • Approve a limited pilot with an explicit review date
  • Publish a signed decision record including rejected alternatives
INSIGHTS / Key takeaways

Key takeaways

01

Chapter 1 — Define the business workflow (days 1–5)

Choose one process with a named executive sponsor and visible baseline metrics. Record the people involved, information they use and final decisions requiring human judgement. For a customer-service summarisation case, measure the time to read a ticket, draft a response and verify its correctness. Separate cost savings from quality improvements; a

02

Chapter 2 — Map data, identities and contractual requirements (days 6–10)

Draw the complete path from user input through model endpoint, retrieval system, logs, storage and human review. Record data residency assumptions and which entities can access prompts and outputs. Document service accounts and relevant privacy restrictions. The resulting data-flow register should be a reviewable artefact, not a collection of email

03

Chapter 3 — Run comparable model and platform tests (days 11–18)

Use the same set of de-identified tasks across candidate platforms. Include routine cases, ambiguous cases, incorrect source documents and a deliberately adversarial instruction embedded in retrieved content. Score factual correctness, citation quality, cost, latency, accessibility and refusal behaviour. Separate a model's raw capability from the a

04

Chapter 4 — Validate operating controls (days 19–24)

Ask each provider or internal platform team to demonstrate audit logs, access separation, model change processes, quotas, incident response and credential revocation. Verify how an application behaves if the model endpoint is unavailable. Run an explicit cost-limit exercise and confirm who receives alerts. For any tool that writes to business syste

05

Chapter 5 — Decide, pilot and establish review gates (days 25–30)

Produce a two-page decision record comparing the baseline, selected workflow, evaluated options, unresolved risks and expected operating cost. Approve a time-limited pilot with a maximum data classification, spending cap, owner and review date. Do not scale solely because employees like the interface. Require measured benefit and no unresolved high

LET'S TALK

Good technology starts with a conversation.

Tell us what you're aiming to achieve. We can discuss your current environment, technology challenges and the right next step.

Start a conversation

Share a few details so we can understand your enquiry.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].